unbreakable cellular bonding Archives > Peplink

5 November 2015
Comments: Off

Singapore National Day Parade Case Study

5 November 2015, Comments: Comments Off on Singapore National Day Parade Case Study

We’ve just released our National Day Parade case study and it’s one of the most relevant examples of successfully achieving large scale surveillance over bonded cellular connections. Other than that, we also got a peek into how the tiny MAX BR1 Slim enabled their Mobile Rider solution – effectively 4 streaming cameras fitted onto a self-balancing scooter – helped them reduce the number of CCTVs they needed to deploy to fixed locations. Here are some photos that didn’t make it onto the case study: And for those of your looking for more information regarding iT-DnS’s Mobile Rider solution, visit EcoRider.


25 August 2015
Comments: Off

Press Release: British National emergency Calls For Peplink

25 August 2015, Comments: Comments Off on Press Release: British National emergency Calls For Peplink

20th August 2015, London: In February 2014, following a devastating storm, the Dawlish railway tracks in Devon, England collapsed and were left hanging in mid-air. Over 300 homes were evacuated due to the flooding that followed. The power was out and public transportation cut off. A national emergency was declared. The UK’s “Cobra” crisis management committee was brought in to handle the situation, with Prime Minister David Cameron eventually taking over the chairmanship. The railway had to be repaired and train service restored within a two-month deadline. The best contractors were brought in, including Trellisworks, a leading networking solution provider. […]


3 March 2015
Comments: Off

[Case Study] Osborne Construction Shaves Months Off Network Setup Time

3 March 2015, Comments: Comments Off on [Case Study] Osborne Construction Shaves Months Off Network Setup Time

Often the most difficult thing about setting up a network at any construction site is being able to do so on schedule. Ordering DSL or indeed any fixed line connectivity could mean anywhere from weeks to months before it gets up and running. This is the exact problem faced by Osborne Construction. “Previously we would need to install ADSL where possible but the lead times are unpredictable and could be anything from weeks to several months. These delays and uncertainties add significant frustration and cost to the project.” Phil Gilbey. Head of IT, Osborne. Fortunately Peplink has the technology and Onwave […]


9 December 2014
Comments: Off

[Case Study] Ferrari Group Gains Fleet Management and Surveillance For Their Valuables-in-Transit Vehicles

9 December 2014, Comments: Comments Off on [Case Study] Ferrari Group Gains Fleet Management and Surveillance For Their Valuables-in-Transit Vehicles

Full case study on how Peplink enables fleet management and surveillance for 100+ armored transports over cellular links.


4 September 2014
Comments: Off

[Case Study] Peplink Powers 50 Stillwater Police Cruisers

4 September 2014, Comments: Comments Off on [Case Study] Peplink Powers 50 Stillwater Police Cruisers

Learn how Stillwater Police proves Peplink ruggedness.